Pages

Showing posts with label toe up 2 at a time socks. Show all posts
Showing posts with label toe up 2 at a time socks. Show all posts

Friday, 24 April 2015

The knitting's back

I love reading the comments on here, I love that people who read my blog also take time to say something.  It is even more lovely when an old friend pops up and comments, perhaps someone who has been reading and commenting ever since I began blogging several years ago.  But it occurred to me this week that a casual visitor to my blog over the last few weeks might have wondered if this is not a knitting blog at all but something about clothes, or even travel.

So I thought it was high time I put the blog back on its tracks.  This is specially important as I have been asked to join in a special blog crawl next week (do come back next Monday to see what that is all about) which has a wonderful wooly theme. The blog crawl has sheep, spinning and knitting in it with a dash of history thrown in - my all time favourite combination, But meanwhile I thought I would share a few of my projects to get us all back in the knitting frame of mind

Firstly, there is a very special event coming up in our family DD2 expects her first baby next week!! You will not be surprised to see I have made a few things

I last posted a photograph of the Vivid baby blanket (pattern by Tin Can Knits) when it was just a pile of squares

This little pink and cream cardigan has buttons from Kath Kidston

Still a work in progress this cream cardigan has a grey lace trim around the sleeves and all around the body

I am making much slower progress with things for me


I have just got as far as swatching for the vintage cardi in Sweet Georgia Tough Love Sock
I don't know what to do with this little sweater, I have picked it up an put it down so often
What do you do with a WIP that is getting to be a white elephant?  The Yarn of this little cream sweater is Angelus by Natural Dye studio.  The yarn is AMAZING and even more precious as NDS is no more. But it has been kicking around in a bag so long (and picked up and put down) that the fabric is badly uneven, I'm not even sure what size needles I was using (robbed off the cable long ago for another project)  I really think it has to be frogged, skeined, washed, wound and begun again.  But it's knitted in the round up to the armholes and the back done - that A LOT of knitting.  What would you do?

Just the toes done on these socks


I've been spinning too

200m of Wensleydale in Evil Beanwater colour-way by Porpoise fur

And some merino from Sweet Georgia Yarns nearly half done

I think that's all I have in progress at the moment.  See you on Monday with news of something rather exciting

xx

c

Monday, 31 December 2012

Making the cut

I am (smugly) pleased to report that this year the hand made Christmas present tally came to


2 scarves
1 tiny sweater



1 patchwork quilt
and a new wardrobe for Daphne

I also put together a kit for DD2 to knit a cushion, I'm counting this as a handmade present because the yarn is from a lovely indie dyer, the needles from the Lantern Moon cooperative and instead of a pattern I made a tiny cushion to illustrate what I had in mind.  I also included a promise, that I would finish the cushion myself if it proved too much.  More of the cushion and some mother daughter bonding later (and an explanation of what constitutes Daphne's wardrobe)

The reason for modest ambitions in the hand made present department was, as you may recall, last year despite knitting right up to Christmas Eve there was much that I had left undone.  The UFOs included one pair of socks knitted up to the instep increases and yarn for another pair that never got done.



So as well as being determined not to get into such a frenzy this year I have also resolved to finish some of the many projects I have in hand and make up a large proportion of my stash before buying more yarn (this must be a generic knitters resolution, I wonder how many people reading this have resolved the same?)

So beginning with the socks.  JTH has need of comfy socks so I decided to complete the half finished pair for him, no need to worry about the third pair, I seem to have used the yarn for something else.

But it was not till I began to check how long the leg needed to be that I discovered how long the feet were.  It's a big advantage with toe up two at a time socks is you can try on as you go, it's only a shame I didn't think of doing this before increasing for the instep.  The socks were clearly far too long in the foot.  However JTH suggested I carried on, finish the socks and wash them as 'they are sure to shrink in the wash'.  Well there was little hope that there would be enough shrinkage to make these babies fit (particularly as the yarn is Rowan super-wash wool).  The problem being that when I began these socks I intended them for someone with a shoe size of 13 not 10



If they were to be wearable at all they had to be shortened by nearly two inches and the toe re-knitted .  I could have drawn a thread at roughly the place that the new toe decreasing needed to start but instead I decided to cut off the toe and pull back the cut part till I achieved a complete row of stitches to pick up.  



Quick but messy, scattering poodle clippings of curly black wool all over the place!  But now the re-modelled socks fit quite well


Are these the first pair of Toe Up (and down) 2 at a Time Socks, I wonder?

Happy New Year (do please let me know your knitting resolutions in the comments section, I'd love to know)

xx

c